A measured index of the American bathroom
Vol. 01 / November 2026 / Costs in USD
Combination 033 / 180
A measured plan for an industrial concrete family bath at 6 by 10 feet, with the layout limits, material set, and cost lines in one place.
Palette
Industrial Concrete
Moisture
8/10
Slip
6.8/10
Upkeep
Moderate
The measured brief
At 6 by 10 feet, this family bath has enough room for a clear plan but no spare inches. The wet zone needs a curb or a fully sloped floor. The Industrial Concrete treatment works because it removes visual stops rather than adding furniture.
A troweled microcement wall with visible movement and a matte sealer. A thick timber or cast-concrete vanity with a simple vessel basin. The restraint is deliberate: the room should read as one composition from the door.
The layout's plumbing reality is straightforward: group the tub and shower on the same wet wall and keep the toilet on the dry side. a linear drain at the shower wall reduces the number of slopes.
The material set is short by design: Microcement, Matte Black Shower System, and Heated Porcelain Tile. A seamless surface with the depth of stone. A graphic silhouette in the wet zone. Together they cover the surface, fitting, and system layers without introducing a fourth visual language.
At $15,800–$37,900, the estimate lands between $263 and $632 per square foot. The largest allowances are finishes and fixtures; the 12 to 18 percent contingency is not padding in a room with this much hidden plumbing.
The same industrial concrete palette would price differently in a larger room, but the bigger shift is geometric. The vanity should stay outside the direct splash zone. That is why the layout is part of the style decision rather than a separate drawing exercise.
“A 60 sq ft room divided into wet and dry zones.”
Microcement — A thin cement-based coating that creates a continuous, matte surface over walls and floors. It is compatible with both the Industrial Concrete palette and the family bath layout. Moisture 9/10, slip 8/10.
The plan
The drawing shows fixture positions, door swing, windows, dimension lines, and the selected style as a color reference. It is a planning drawing, not a permit set.
Plumbing
Group the tub and shower on the same wet wall and keep the toilet on the dry side. A linear drain at the shower wall reduces the number of slopes.
Storage
Use a tall cabinet in the dry zone and a niche in the wet zone. Keep towels within reach of the shower without crossing the wet floor.
Lighting
Use 3000 K downlights in the dry zone and a separate moisture-rated light in the wet zone. A dimmer at the vanity is useful for night use.
The material set
One finish, one fixture family, and one technical layer. The compatibility score is a planning signal, not a warranty.
Continuous coating
M01A seamless surface with the depth of stone.
A thin cement-based coating that creates a continuous, matte surface over walls and floors.
Fixture
M02A graphic silhouette in the wet zone.
A shower valve, rain head, and hand shower set with a matte black finish.
Floor system
M03Warm stone underfoot, without the bulk.
A porcelain tile floor with an electric or hydronic heating layer beneath it.
| Material | Type | Compatibility | Cost | Moisture | Slip | Upkeep |
|---|---|---|---|---|---|---|
| Microcement | Continuous coating | 10.0/10 | $16–$28 / sq ft | 9/10 | 8/10 | Low |
| Matte Black Shower System | Fixture | 9.0/10 | $350–$1,200 / set | 9/10 | 3/10 | Moderate |
| Heated Porcelain Tile | Floor system | 8.0/10 | $18–$32 / sq ft | 9/10 | 8/10 | Low |
Material note / 01
Microcement — A thin cement-based coating that creates a continuous, matte surface over walls and floors. It is compatible with both the Industrial Concrete palette and the family bath layout. Moisture 9/10, slip 8/10.
Material note / 02
Matte Black Shower System — A shower valve, rain head, and hand shower set with a matte black finish. It belongs to the Industrial Concrete material family and keeps the palette coherent. Moisture 9/10, slip 3/10.
Material note / 03
Heated Porcelain Tile — A porcelain tile floor with an electric or hydronic heating layer beneath it. It is specified for the family bath layout, where its dimensions and moisture performance matter. Moisture 9/10, slip 8/10.
The cost
Line-item estimate for a 60 sq ft family bath in the Industrial Concrete style. The range assumes the existing plumbing stack stays in place.
| Cost line | Low | High | Share of high |
|---|---|---|---|
| Demolition and disposalRemoval of existing finishes, fixtures, and debris haul-away. | $700 | $1,150 | 3% |
| Waterproofing and shower panMembrane, corners, drain bonding, and a 24-hour flood test. | $550 | $1,000 | 3% |
| Plumbing rough-in4 fixture connections; assumes the stack stays in place. | $1,750 | $3,350 | 9% |
| Electrical and ventilationGFCI protection, fan, lighting rough-in, and switches. | $1,350 | $2,950 | 8% |
| Wall and floor finishesTile, stone, or microcement, including setting materials and trim. | $1,350 | $3,000 | 8% |
| Fixtures and fittingsToilet, shower valve, tub filler, sink faucets, and drain trim. | $3,750 | $7,950 | 21% |
| Vanity and millwork1 basin; includes cabinet, top, and installation. | $1,400 | $3,900 | 10% |
| Design, permits, and inspectionsDrawing, permit fees, and inspection coordination. | $700 | $1,700 | 4% |
| Labor and project managementCoordination, site protection, and trade supervision. | $2,550 | $7,050 | 19% |
| ContingencyReserved for hidden conditions and owner changes. | $1,700 | $5,800 | 15% |
| Total project | $15,800 | $37,900 | $263–$632 / sq ft |
Estimated $15,800–$37,900 total / $263–$632 per sq ft / 25–39 working days.
Budget reading
$15,800–$37,900
$263–$632 per sq ft
Build window
25–39 days
After permits. Custom glass, stone, and millwork add lead time before installation.
Design moves
Move / 01
01Use a tall cabinet in the dry zone and a niche in the wet zone. Keep towels within reach of the shower without crossing the wet floor. A recessed cabinet or a shallow niche adds more useful storage than a deeper vanity.
Move / 02
02The vanity should stay outside the direct splash zone. A bathroom that works after a shower, with wet towels and a full counter, is a better investment than one that only photographs well.
Move / 03
03Use a waterproof membrane beneath microcement and seal the surface every 12 to 24 months. Keep bare steel out of the splash zone. The waterproofing and slope are the real luxury; the surface is the visible layer.
Move / 04
042700 K at 90 CRI keeps concrete from reading blue. Use a dimmer and avoid cool white LEDs over the mirror. Put the vanity, shower, and ambient light on separate switches so the room can shift from task to evening.
The watchouts
The five items below are the highest-risk details in this combination. The wet zone needs a curb or a fully sloped floor.
The wet zone needs a curb or a fully sloped floor.
01The vanity should stay outside the direct splash zone.
02Sealed concrete and microcement need periodic re-sealing.
03Dark surfaces show soap residue and hard-water film.
04Faux brick veneer in the shower zone.
05Keep comparing
The closest alternatives by style, layout, and budget. Open one change at a time so the cost difference has a cause.
Industrial Concrete / Wet room
001Plan an industrial concrete bathroom in a curbless wet room: layout limits, three compatible materials, a $17,000–$40,200 cost breakdown, and a practical FAQ.
Industrial Concrete / Attic bath
002Plan an industrial concrete bathroom in an attic sloped-ceiling bath: layout limits, three compatible materials, a $16,600–$39,500 cost breakdown, and a practical FAQ.
Industrial Concrete / Galley bath
003Plan an industrial concrete bathroom in a narrow galley bathroom: layout limits, three compatible materials, a $12,600–$30,600 cost breakdown, and a practical FAQ.
Industrial Concrete / Shared bath
004Plan an industrial concrete bathroom in a jack-and-jill bathroom: layout limits, three compatible materials, a $20,200–$48,300 cost breakdown, and a practical FAQ.
Field guides
Substrate / 7 min
G01Where each backer belongs, what the code requires, and why neither one is a substitute for a membrane.
Waterproofing / 9 min
G02How to set a shower slope, choose a drain, and avoid standing water in a curbless wet room.
Maintenance / 8 min
G03How to choose grout, seal it correctly, and keep joints and caulk from becoming a mold reservoir.
FAQ
Practical answers drawn from the specification, cost model, and installation sequence.