A measured plan for an industrial concrete wet room at 7 by 9 feet, with the layout limits, material set, and cost lines in one place.
Palette
Industrial Concrete
Moisture
8.4/10
Slip
6.7/10
Upkeep
Moderate
The measured brief
This 63 sq ft wet room is defined by its proportions: 7 feet across and 9 feet deep. The entire floor must be waterproofed and sloped to drain. The Industrial Concrete answer is to keep the wet zone legible and spend the remaining wall space on storage and light.
A troweled microcement wall with visible movement and a matte sealer. Black steel shower framing or a black grid glass partition. Those two moves do more for the room than a decorative feature wall.
Plan the wet zone first. Center the tub on its own supply and keep the shower valve reachable from the entry. A linear drain at the shower wall reduces framing depth and simplifies the pan. Use a wall-hung vanity, a deep niche, and a freestanding shelf. Keep towels on a hook outside the spray zone.
The material set is short by design: Terrazzo, Matte Black Shower System, and Liquid Waterproofing Membrane. Aggregate, binder, and a thousand small decisions. A graphic silhouette in the wet zone. Together they cover the surface, fitting, and system layers without introducing a fourth visual language.
At $17,000–$40,200, the estimate lands between $270 and $638 per square foot. The largest allowances are finishes and fixtures; the 12 to 18 percent contingency is not padding in a room with this much hidden plumbing.
The same industrial concrete palette would price differently in a larger room, but the bigger shift is geometric. The vanity and toilet should stay out of the direct spray. That is why the layout is part of the style decision rather than a separate drawing exercise.
“A 63 sq ft open shower and bathing room.”
Terrazzo — A composite surface of stone chips set in cement or resin, used for floors, walls, and vanity tops. It is compatible with both the Industrial Concrete palette and the wet room layout. Moisture 9/10, slip 8/10.
The plan
The drawing shows fixture positions, door swing, windows, dimension lines, and the selected style as a color reference. It is a planning drawing, not a permit set.
Plumbing
Center the tub on its own supply and keep the shower valve reachable from the entry. A linear drain at the shower wall reduces framing depth and simplifies the pan.
Storage
Use a wall-hung vanity, a deep niche, and a freestanding shelf. Keep towels on a hook outside the spray zone.
Lighting
Use 3000 K at 90 CRI with a dimmable shower light and a separate vanity light. A moisture-rated fixture is required in the wet zone.
The material set
One finish, one fixture family, and one technical layer. The compatibility score is a planning signal, not a warranty.
Composite surface
M01Aggregate, binder, and a thousand small decisions.
A composite surface of stone chips set in cement or resin, used for floors, walls, and vanity tops.
Fixture
M02A graphic silhouette in the wet zone.
A shower valve, rain head, and hand shower set with a matte black finish.
Membrane
M03A continuous skin for complex corners.
A trowel- or roller-applied waterproof coating used under tile in showers and wet rooms.
| Material | Type | Compatibility | Cost | Moisture | Slip | Upkeep |
|---|---|---|---|---|---|---|
| Terrazzo | Composite surface | 10.0/10 | $18–$35 / sq ft | 9/10 | 8/10 | Low |
| Matte Black Shower System | Fixture | 10.0/10 | $350–$1,200 / set | 9/10 | 3/10 | Moderate |
| Liquid Waterproofing Membrane | Membrane | 8.0/10 | $3–$7 / sq ft | 10/10 | 4/10 | Low |
Material note / 01
Terrazzo — A composite surface of stone chips set in cement or resin, used for floors, walls, and vanity tops. It is compatible with both the Industrial Concrete palette and the wet room layout. Moisture 9/10, slip 8/10.
Material note / 02
Matte Black Shower System — A shower valve, rain head, and hand shower set with a matte black finish. It is compatible with both the Industrial Concrete palette and the wet room layout. Moisture 9/10, slip 3/10.
Material note / 03
Liquid Waterproofing Membrane — A trowel- or roller-applied waterproof coating used under tile in showers and wet rooms. It is specified for the wet room layout, where its dimensions and moisture performance matter. Moisture 10/10, slip 4/10.
The cost
Line-item estimate for a 63 sq ft wet room in the Industrial Concrete style. The range assumes the existing plumbing stack stays in place.
| Cost line | Low | High | Share of high |
|---|---|---|---|
| Demolition and disposalRemoval of existing finishes, fixtures, and debris haul-away. | $800 | $1,350 | 3% |
| Waterproofing and shower panMembrane, corners, drain bonding, and a 24-hour flood test. | $800 | $1,550 | 4% |
| Plumbing rough-in4 fixture connections; assumes the stack stays in place. | $2,000 | $3,750 | 9% |
| Electrical and ventilationGFCI protection, fan, lighting rough-in, and switches. | $1,400 | $3,000 | 7% |
| Wall and floor finishesTile, stone, or microcement, including setting materials and trim. | $1,450 | $3,200 | 8% |
| Fixtures and fittingsToilet, shower valve, tub filler, sink faucets, and drain trim. | $3,800 | $8,100 | 20% |
| Vanity and millwork1 basin; includes cabinet, top, and installation. | $1,400 | $3,900 | 10% |
| Design, permits, and inspectionsDrawing, permit fees, and inspection coordination. | $700 | $1,750 | 4% |
| Labor and project managementCoordination, site protection, and trade supervision. | $2,750 | $7,450 | 19% |
| ContingencyReserved for hidden conditions and owner changes. | $1,850 | $6,150 | 15% |
| Total project | $17,000 | $40,200 | $270–$638 / sq ft |
Estimated $17,000–$40,200 total / $270–$638 per sq ft / 31–46 working days.
Budget reading
$17,000–$40,200
$270–$638 per sq ft
Build window
31–46 days
After permits. Custom glass, stone, and millwork add lead time before installation.
Design moves
Move / 01
01A linear drain simplifies the slope and tile layout. Mark it on the floor before demolition and check it against every fixture you order.
Move / 02
02Terrazzo is the strongest visual investment in this scheme. Keep the other surfaces quieter so the budget reads as intention rather than compromise.
Move / 03
03A troweled microcement wall with visible movement and a matte sealer. Repeat that material at the shower niche or vanity rather than introducing a second accent.
Move / 04
04Use a wall-hung vanity, a deep niche, and a freestanding shelf. Keep towels on a hook outside the spray zone. A recessed cabinet or a shallow niche adds more useful storage than a deeper vanity.
The watchouts
The five items below are the highest-risk details in this combination. The entire floor must be waterproofed and sloped to drain.
The entire floor must be waterproofed and sloped to drain.
01The vanity and toilet should stay out of the direct spray.
02Sealed concrete and microcement need periodic re-sealing.
03Dark surfaces show soap residue and hard-water film.
04Faux brick veneer in the shower zone.
05Keep comparing
The closest alternatives by style, layout, and budget. Open one change at a time so the cost difference has a cause.
Industrial Concrete / Family bath
001Plan an industrial concrete bathroom in a split wet-dry bath: layout limits, three compatible materials, a $15,800–$37,900 cost breakdown, and a practical FAQ.
Industrial Concrete / Family bath
002Plan an industrial concrete bathroom in a double-vanity family bath: layout limits, three compatible materials, a $20,000–$47,900 cost breakdown, and a practical FAQ.
Industrial Concrete / Attic bath
003Plan an industrial concrete bathroom in an attic sloped-ceiling bath: layout limits, three compatible materials, a $16,600–$39,500 cost breakdown, and a practical FAQ.
Industrial Concrete / Shared bath
004Plan an industrial concrete bathroom in a jack-and-jill bathroom: layout limits, three compatible materials, a $20,200–$48,300 cost breakdown, and a practical FAQ.
Field guides
Waterproofing / 9 min
G01How to choose a shower membrane by substrate, drain type, schedule, and installer skill.
Waterproofing / 7 min
G02A step-by-step flood test procedure for shower pans, including failure points and documentation.
Heating / 8 min
G03How electric and hydronic floor heating work, what they cost to run, and where they make sense.
FAQ
Practical answers drawn from the specification, cost model, and installation sequence.