A measured plan for a wet room converted bath at 5 by 8 feet, with the layout limits, material set, and cost lines in one place.

40 sq ft5′ × 8′18–30 days$13,200–$31,400

Palette

Wet Room

1.28 index

Moisture

9.2/10

Slip

7.2/10

Upkeep

Low

The measured brief

At 5 by 8 feet, this converted bath has enough room for a clear plan but no spare inches. The existing drain may need to move to the center of the new pan. The Wet Room treatment works because it removes visual stops rather than adding furniture.

A continuous waterproof membrane across the entire floor. A heated floor for comfort and faster drying. The restraint is deliberate: the room should read as one composition from the door.

The layout's plumbing reality is straightforward: reuse the tub drain if the new pan aligns with it; otherwise relocate the drain before the pan is poured. a linear drain at the back wall simplifies the slope and tile layout.

The material set is short by design: Frameless Glass Enclosure, Linear Shower Drain, and Large-Format Porcelain Slab. Less frame, more light. One slope, one clean line. Together they cover the surface, fitting, and system layers without introducing a fourth visual language.

At $13,200–$31,400, the estimate lands between $330 and $785 per square foot. The largest allowances are finishes and fixtures; the 12 to 18 percent contingency is not padding in a room with this much hidden plumbing.

What changes when the room changes

The same wet room palette would price differently in a larger room, but the bigger shift is geometric. The shower opening should be at least 24 inches wide. That is why the layout is part of the style decision rather than a separate drawing exercise.

“Same footprint, better daily use.”

Frameless Glass Enclosure — A shower enclosure made from tempered glass with minimal or concealed hardware. It is compatible with both the Wet Room palette and the converted bath layout. Moisture 9/10, slip 3/10.

The plan

Tub-to-Shower Conversion, drawn to scale.

The drawing shows fixture positions, door swing, windows, dimension lines, and the selected style as a color reference. It is a planning drawing, not a permit set.

Measured floor plan for the Tub-to-Shower Conversion: 5 by 8 feet, 40 square feet. 60 in curbless shower60 in curbless shower24 in vanity24 in vanityToilet30 in doorLinear drainFixed glass5′–0″8′–0″N
Tub-to-Shower Conversion / 5′ × 8′ / 40 sq ftDrawing not to scale

Plumbing

Reuse the tub drain if the new pan aligns with it; otherwise relocate the drain before the pan is poured. A linear drain at the back wall simplifies the slope and tile layout.

Storage

Add a niche in the shower and a shallow cabinet where the tub deck used to be. A bench can provide storage and a place to sit.

Lighting

A 3000 K shower light and a separate vanity light are ideal. Make the shower light moisture-rated and place it outside the direct spray.

The material set

Three materials, three jobs.

One finish, one fixture family, and one technical layer. The compatibility score is a planning signal, not a warranty.

Skip to cost
Frameless Glass Enclosure material section and layer build-up01020304MATERIAL / GLASSNOT TO SCALE

Enclosure

M01

Frameless Glass Enclosure

Less frame, more light.

A shower enclosure made from tempered glass with minimal or concealed hardware.

Installed
$80–$160
per sq ft
Moisture
9/10
Slip
3/10
Linear Shower Drain material section and layer build-up01020304MATERIAL / LINEARNOT TO SCALE

Drainage

M02

Linear Shower Drain

One slope, one clean line.

A long, narrow drain set along a wall or at the shower threshold, used with a sloped shower floor.

Installed
$180–$700
per unit
Moisture
10/10
Slip
7/10
Large-Format Porcelain Slab material section and layer build-up01020304MATERIAL / STONENOT TO SCALE

Surface

M03

Large-Format Porcelain Slab

Fewer joints, larger planes.

A porcelain slab in sizes from 24 by 48 inches up to 63 by 126 inches, used on walls and floors.

Installed
$12–$30
per sq ft
Moisture
10/10
Slip
7/10
Selected materials for the Wet Room bathroom in a Tub-to-Shower Conversion, with compatibility, cost, and performance ratings.
MaterialTypeCompatibilityCostMoistureSlipUpkeep
Frameless Glass EnclosureEnclosure10.0/10$80–$160 / sq ft9/103/10Low
Linear Shower DrainDrainage10.0/10$180–$700 / unit10/107/10Moderate
Large-Format Porcelain SlabSurface8.5/10$12–$30 / sq ft10/107/10Low

Material note / 01

Frameless Glass Enclosure — A shower enclosure made from tempered glass with minimal or concealed hardware. It is compatible with both the Wet Room palette and the converted bath layout. Moisture 9/10, slip 3/10.

Material note / 02

Linear Shower Drain — A long, narrow drain set along a wall or at the shower threshold, used with a sloped shower floor. It is compatible with both the Wet Room palette and the converted bath layout. Moisture 10/10, slip 7/10.

Material note / 03

Large-Format Porcelain Slab — A porcelain slab in sizes from 24 by 48 inches up to 63 by 126 inches, used on walls and floors. It belongs to the Wet Room material family and keeps the palette coherent. Moisture 10/10, slip 7/10.

The cost

A $13,200–$31,400 plan.

Line-item estimate for a 40 sq ft converted bath in the Wet Room style. The range assumes the existing plumbing stack stays in place.

Estimated cost lines for the Wet Room bathroom in a Tub-to-Shower Conversion.
Cost lineLowHighShare of high
Demolition and disposalRemoval of existing finishes, fixtures, and debris haul-away.$500$8503%
Waterproofing and shower panMembrane, corners, drain bonding, and a 24-hour flood test.$450$8003%
Plumbing rough-in3 fixture connections; assumes the stack stays in place.$1,300$2,4008%
Electrical and ventilationGFCI protection, fan, lighting rough-in, and switches.$1,200$2,7009%
Wall and floor finishesTile, stone, or microcement, including setting materials and trim.$1,000$2,2007%
Fixtures and fittingsToilet, shower valve, tub filler, sink faucets, and drain trim.$2,950$6,35020%
Vanity and millwork1 basin; includes cabinet, top, and installation.$1,550$3,90012%
Design, permits, and inspectionsDrawing, permit fees, and inspection coordination.$600$1,5505%
Labor and project managementCoordination, site protection, and trade supervision.$2,150$5,85019%
ContingencyReserved for hidden conditions and owner changes.$1,450$4,80015%
Total project$13,200$31,400$330–$785 / sq ft

Estimated $13,200–$31,400 total / $330–$785 per sq ft / 18–30 working days.

Budget reading

$13,200–$31,400

$330–$785 per sq ft

  • Finishes and fixtures are the adjustable lines.
  • Waterproofing, plumbing, and labor are not the place to cut.
  • Contingency is included; keep it for hidden conditions.
  • Moving the stack or adding steam will push the high number higher.

Build window

18–30 days

After permits. Custom glass, stone, and millwork add lead time before installation.

Design moves

Four decisions that make the plan work.

Move / 01

01

Design for the messiest day

The shower opening should be at least 24 inches wide. A bathroom that works after a shower, with wet towels and a full counter, is a better investment than one that only photographs well.

Move / 02

02

Resolve the wet detail before the finish

Full-floor waterproofing is non-negotiable. Use a bonded membrane, reinforce every corner, and flood-test for 24 hours before tile. The waterproofing and slope are the real luxury; the surface is the visible layer.

Move / 03

03

Keep the lighting layers separate

3000 K at 90 CRI, with a separate dimmable circuit for the shower. A moisture-rated fixture is required inside the wet zone. Put the vanity, shower, and ambient light on separate switches so the room can shift from task to evening.

Move / 04

04

Use the 5-foot width deliberately

Keep the clear path on the long axis and avoid furniture that projects into it. In a converted bath, the width is the constraint that decides whether the room feels calm or crowded.

The watchouts

What to resolve before tile.

The five items below are the highest-risk details in this combination. The existing drain may need to move to the center of the new pan.

  1. The existing drain may need to move to the center of the new pan.

    01
  2. The shower opening should be at least 24 inches wide.

    02
  3. Water travels farther, so the whole floor must be waterproofed.

    03
  4. A bad slope leads to standing water and callbacks.

    04
  5. A single central drain with an inconsistent slope.

    05

What carries the plan

  • The open floor makes even a small bathroom feel larger.
  • Improves access and safety without moving walls.
  • Keeps the bathroom visually open.
  • Allows a single slope and large-format floor tile.
  • Fewer grout lines to clean.

What can undermine it

  • Water travels farther, so the whole floor must be waterproofed.
  • Loses the only tub in a small home.
  • Shows water spots and soap film.
  • Requires accurate framing and slope.
  • Heavy and difficult to handle.

Keep comparing

Four nearby combinations.

The closest alternatives by style, layout, and budget. Open one change at a time so the cost difference has a cause.

Open the full matrix

Wet Room / Guest bath

001

5×8 Small Guest Bath

Plan a wet room bathroom in a 5×8 small guest bath: layout limits, three compatible materials, a $12,800–$30,800 cost breakdown, and a practical FAQ.

Size
5′ × 8′
Budget
$12,800–$30,800
Build
16–28 d
Ceiling Exhaust FanFrameless Glass EnclosureLarge-Format Porcelain Slab
Open the plan

Wet Room / Accessible bath

002

Accessible Walk-In Bath

Plan a wet room bathroom in an accessible walk-in bath: layout limits, three compatible materials, an $18,100–$43,100 cost breakdown, and a practical FAQ.

Size
8′ × 10′
Budget
$18,100–$43,100
Build
32–48 d
Linear Shower DrainSmart Bidet ToiletLarge-Format Porcelain Slab
Open the plan

Wet Room / Family bath

003

Split Wet-Dry Bath

Plan a wet room bathroom in a split wet-dry bath: layout limits, three compatible materials, a $17,300–$41,200 cost breakdown, and a practical FAQ.

Size
6′ × 10′
Budget
$17,300–$41,200
Build
25–39 d
Heated Porcelain TileFrameless Glass EnclosureLarge-Format Porcelain Slab
Open the plan

Wet Room / Galley bath

004

Narrow Galley Bathroom

Plan a wet room bathroom in a narrow galley bathroom: layout limits, three compatible materials, a $13,700–$33,100 cost breakdown, and a practical FAQ.

Size
5′ × 10′
Budget
$13,700–$33,100
Build
20–32 d
Frameless Glass EnclosureLarge-Format Porcelain SlabCeiling Exhaust Fan
Open the plan

Field guides

The systems behind this plan.

All 15 guides

FAQ

Wet Room in a Tub-to-Shower Conversion: the questions.

Practical answers drawn from the specification, cost model, and installation sequence.

How much does a Wet Room bathroom in a Tub-to-Shower Conversion cost?
A full remodel at this specification is estimated at $13,200–$31,400, or $330 to $785 per square foot. The largest lines are wall and floor finishes ($1,000–$2,200) and fixtures ($2,950–$6,350). The range assumes the stack stays in place and the recommended materials are used. Moving the toilet or tub, adding a steam generator, or choosing solid slab stone can push the upper number higher.
Will Wet Room work in a 5′ × 8′ converted bath?
Yes, if the plan respects the room's actual limits. The existing drain may need to move to the center of the new pan. Works in rooms at least 5 feet wide. Keep the vanity outside the direct splash zone or specify a moisture-resistant cabinet. Keep the first priority on the clear path and the wet-zone detailing, then let the palette do the rest.
Which three materials should I specify?
Frameless Glass Enclosure, Linear Shower Drain, and Large-Format Porcelain Slab form the core specification. Frameless Glass Enclosure — A shower enclosure made from tempered glass with minimal or concealed hardware. It is compatible with both the Wet Room palette and the converted bath layout. Moisture 9/10, slip 3/10. Linear Shower Drain — A long, narrow drain set along a wall or at the shower threshold, used with a sloped shower floor. It is compatible with both the Wet Room palette and the converted bath layout. Moisture 10/10, slip 7/10. Large-Format Porcelain Slab — A porcelain slab in sizes from 24 by 48 inches up to 63 by 126 inches, used on walls and floors. It belongs to the Wet Room material family and keeps the palette coherent. Moisture 10/10, slip 7/10. Use the material pages for installation notes and current cost bands.
How long does this combination take to build?
Plan for 18 to 30 working days after permits. The sequence is demolition, rough-in, waterproofing and flood test, tile, fixtures, glass, and punch list. Custom millwork or a stone tub can add lead time before installation begins.
What lighting temperature suits this bathroom?
Use 3000 K at 90+ CRI as the base. 3000 K at 90 CRI, with a separate dimmable circuit for the shower. A moisture-rated fixture is required inside the wet zone. Put the vanity light at eye level and keep a separate dimmed circuit for the shower and night path.
Is this combination a good resale decision?
It is strongest when the layout fixes a daily problem and the palette stays broadly appealing. The open floor makes even a small bathroom feel larger. Avoid over-improving for the neighborhood and keep the waterproofing, ventilation, and plumbing documentation; those are the details a buyer's inspector can verify.