A measured plan for a warm brutalism converted bath at 5 by 8 feet, with the layout limits, material set, and cost lines in one place.

40 sq ft5′ × 8′18–31 days$14,500–$34,400

Palette

Warm Brutalism

1.25 index

Moisture

8.1/10

Slip

6.3/10

Upkeep

Low

The measured brief

At 5 by 8 feet, this converted bath has enough room for a clear plan but no spare inches. The existing drain may need to move to the center of the new pan. The Warm Brutalism treatment works because it removes visual stops rather than adding furniture.

A monolithic stone or concrete vanity with a trough basin. A blackened steel or bronze tap with a heavy profile. The restraint is deliberate: the room should read as one composition from the door.

The layout's plumbing reality is straightforward: reuse the tub drain if the new pan aligns with it; otherwise relocate the drain before the pan is poured. a linear drain at the back wall simplifies the slope and tile layout.

The material set is short by design: Matte Black Shower System, Microcement, and Liquid Waterproofing Membrane. A graphic silhouette in the wet zone. A seamless surface with the depth of stone. Together they cover the surface, fitting, and system layers without introducing a fourth visual language.

At $14,500–$34,400, the estimate lands between $363 and $860 per square foot. The largest allowances are finishes and fixtures; the 12 to 18 percent contingency is not padding in a room with this much hidden plumbing.

What changes when the room changes

The same warm brutalism palette would price differently in a larger room, but the bigger shift is geometric. The shower opening should be at least 24 inches wide. That is why the layout is part of the style decision rather than a separate drawing exercise.

“Same footprint, better daily use.”

Matte Black Shower System — A shower valve, rain head, and hand shower set with a matte black finish. It is compatible with both the Warm Brutalism palette and the converted bath layout. Moisture 9/10, slip 3/10.

The plan

Tub-to-Shower Conversion, drawn to scale.

The drawing shows fixture positions, door swing, windows, dimension lines, and the selected style as a color reference. It is a planning drawing, not a permit set.

Measured floor plan for the Tub-to-Shower Conversion: 5 by 8 feet, 40 square feet. 60 in curbless shower60 in curbless shower24 in vanity24 in vanityToilet30 in doorLinear drainFixed glass5′–0″8′–0″N
Tub-to-Shower Conversion / 5′ × 8′ / 40 sq ftDrawing not to scale

Plumbing

Reuse the tub drain if the new pan aligns with it; otherwise relocate the drain before the pan is poured. A linear drain at the back wall simplifies the slope and tile layout.

Storage

Add a niche in the shower and a shallow cabinet where the tub deck used to be. A bench can provide storage and a place to sit.

Lighting

A 3000 K shower light and a separate vanity light are ideal. Make the shower light moisture-rated and place it outside the direct spray.

The material set

Three materials, three jobs.

One finish, one fixture family, and one technical layer. The compatibility score is a planning signal, not a warranty.

Skip to cost
Matte Black Shower System material section and layer build-up01020304MATERIAL / BRUSHEDNOT TO SCALE

Fixture

M01

Matte Black Shower System

A graphic silhouette in the wet zone.

A shower valve, rain head, and hand shower set with a matte black finish.

Installed
$350–$1,200
per set
Moisture
9/10
Slip
3/10
Microcement material section and layer build-up0102030405MATERIAL / SPECKLENOT TO SCALE

Continuous coating

M02

Microcement

A seamless surface with the depth of stone.

A thin cement-based coating that creates a continuous, matte surface over walls and floors.

Installed
$16–$28
per sq ft
Moisture
9/10
Slip
8/10
Liquid Waterproofing Membrane material section and layer build-up01020304MATERIAL / COATNOT TO SCALE

Membrane

M03

Liquid Waterproofing Membrane

A continuous skin for complex corners.

A trowel- or roller-applied waterproof coating used under tile in showers and wet rooms.

Installed
$3–$7
per sq ft
Moisture
10/10
Slip
4/10
Selected materials for the Warm Brutalism bathroom in a Tub-to-Shower Conversion, with compatibility, cost, and performance ratings.
MaterialTypeCompatibilityCostMoistureSlipUpkeep
Matte Black Shower SystemFixture10.0/10$350–$1,200 / set9/103/10Moderate
MicrocementContinuous coating9.0/10$16–$28 / sq ft9/108/10Low
Liquid Waterproofing MembraneMembrane8.0/10$3–$7 / sq ft10/104/10Low

Material note / 01

Matte Black Shower System — A shower valve, rain head, and hand shower set with a matte black finish. It is compatible with both the Warm Brutalism palette and the converted bath layout. Moisture 9/10, slip 3/10.

Material note / 02

Microcement — A thin cement-based coating that creates a continuous, matte surface over walls and floors. It belongs to the Warm Brutalism material family and keeps the palette coherent. Moisture 9/10, slip 8/10.

Material note / 03

Liquid Waterproofing Membrane — A trowel- or roller-applied waterproof coating used under tile in showers and wet rooms. It is specified for the converted bath layout, where its dimensions and moisture performance matter. Moisture 10/10, slip 4/10.

The cost

A $14,500–$34,400 plan.

Line-item estimate for a 40 sq ft converted bath in the Warm Brutalism style. The range assumes the existing plumbing stack stays in place.

Estimated cost lines for the Warm Brutalism bathroom in a Tub-to-Shower Conversion.
Cost lineLowHighShare of high
Demolition and disposalRemoval of existing finishes, fixtures, and debris haul-away.$500$8502%
Waterproofing and shower panMembrane, corners, drain bonding, and a 24-hour flood test.$450$8002%
Plumbing rough-in3 fixture connections; assumes the stack stays in place.$1,300$2,4007%
Electrical and ventilationGFCI protection, fan, lighting rough-in, and switches.$1,200$2,7008%
Wall and floor finishesTile, stone, or microcement, including setting materials and trim.$1,050$2,3007%
Fixtures and fittingsToilet, shower valve, tub filler, sink faucets, and drain trim.$3,050$6,55019%
Vanity and millwork1 basin; includes cabinet, top, and installation.$2,400$5,60016%
Design, permits, and inspectionsDrawing, permit fees, and inspection coordination.$600$1,5505%
Labor and project managementCoordination, site protection, and trade supervision.$2,350$6,40019%
ContingencyReserved for hidden conditions and owner changes.$1,550$5,25015%
Total project$14,500$34,400$363–$860 / sq ft

Estimated $14,500–$34,400 total / $363–$860 per sq ft / 18–31 working days.

Budget reading

$14,500–$34,400

$363–$860 per sq ft

  • Finishes and fixtures are the adjustable lines.
  • Waterproofing, plumbing, and labor are not the place to cut.
  • Contingency is included; keep it for hidden conditions.
  • Moving the stack or adding steam will push the high number higher.

Build window

18–31 days

After permits. Custom glass, stone, and millwork add lead time before installation.

Design moves

Four decisions that make the plan work.

Move / 01

01

Resolve the wet detail before the finish

Seal stone and concrete in wet zones, and use a membrane behind rough plaster. Keep porous materials out of direct shower spray unless rated. The waterproofing and slope are the real luxury; the surface is the visible layer.

Move / 02

02

Keep the lighting layers separate

2700 K at 90 CRI with wall washers or sconces. Avoid recessed downlights directly above the mirror, which flatten the stone. Put the vanity, shower, and ambient light on separate switches so the room can shift from task to evening.

Move / 03

03

Use the 5-foot width deliberately

Keep the clear path on the long axis and avoid furniture that projects into it. In a converted bath, the width is the constraint that decides whether the room feels calm or crowded.

Move / 04

04

Protect the clearance that matters

A curbless pan requires recessing the floor or raising the bathroom floor. Mark it on the floor before demolition and check it against every fixture you order.

The watchouts

What to resolve before tile.

The five items below are the highest-risk details in this combination. The existing drain may need to move to the center of the new pan.

  1. The existing drain may need to move to the center of the new pan.

    01
  2. The shower opening should be at least 24 inches wide.

    02
  3. Stone and concrete are heavy and may require structural review.

    03
  4. Rough surfaces can be difficult to clean.

    04
  5. Thin floating shelves that undermine the mass.

    05

What carries the plan

  • Stone and concrete create a strong, durable focal point.
  • Improves access and safety without moving walls.
  • Strong visual contrast with minimal effort.
  • No grout lines to scrub or stain.
  • Conforms to complex shapes and niches.

What can undermine it

  • Stone and concrete are heavy and may require structural review.
  • Loses the only tub in a small home.
  • Shows soap scum and hard-water spots.
  • Requires a skilled applicator and a rigid substrate.
  • Requires correct thickness and cure time.

Keep comparing

Four nearby combinations.

The closest alternatives by style, layout, and budget. Open one change at a time so the cost difference has a cause.

Open the full matrix

Warm Brutalism / Galley bath

001

Narrow Galley Bathroom

Plan a warm brutalism bathroom in a narrow galley bathroom: layout limits, three compatible materials, a $15,200–$36,300 cost breakdown, and a practical FAQ.

Size
5′ × 10′
Budget
$15,200–$36,300
Build
20–33 d
Matte Black Shower SystemTerrazzoCeiling Exhaust Fan
Open the plan

Warm Brutalism / Half bath

002

Powder Room

Plan a warm brutalism bathroom in a powder room: layout limits, three compatible materials, a $9,800–$23,700 cost breakdown, and a practical FAQ.

Size
4′ × 5′
Budget
$9,800–$23,700
Build
11–22 d
TerrazzoMatte Black Shower SystemCement Board Backer
Open the plan

Warm Brutalism / Family bath

003

Split Wet-Dry Bath

Plan a warm brutalism bathroom in a split wet-dry bath: layout limits, three compatible materials, an $18,900–$44,500 cost breakdown, and a practical FAQ.

Size
6′ × 10′
Budget
$18,900–$44,500
Build
25–40 d
MicrocementFreestanding Stone TubLinear Shower Drain
Open the plan

Warm Brutalism / Guest bath

004

5×8 Small Guest Bath

Plan a warm brutalism bathroom in a 5×8 small guest bath: layout limits, three compatible materials, a $14,200–$33,900 cost breakdown, and a practical FAQ.

Size
5′ × 8′
Budget
$14,200–$33,900
Build
16–29 d
Matte Black Shower SystemTerrazzoCeiling Exhaust Fan
Open the plan

Field guides

The systems behind this plan.

All 15 guides

FAQ

Warm Brutalism in a Tub-to-Shower Conversion: the questions.

Practical answers drawn from the specification, cost model, and installation sequence.

How much does a Warm Brutalism bathroom in a Tub-to-Shower Conversion cost?
A full remodel at this specification is estimated at $14,500–$34,400, or $363 to $860 per square foot. The largest lines are wall and floor finishes ($1,050–$2,300) and fixtures ($3,050–$6,550). The range assumes the stack stays in place and the recommended materials are used. Moving the toilet or tub, adding a steam generator, or choosing solid slab stone can push the upper number higher.
Will Warm Brutalism work in a 5′ × 8′ converted bath?
Yes, if the plan respects the room's actual limits. The existing drain may need to move to the center of the new pan. Needs enough floor area for a heavy vanity and a clear shower. In a powder room, use one stone element and keep the rest light. Keep the first priority on the clear path and the wet-zone detailing, then let the palette do the rest.
Which three materials should I specify?
Matte Black Shower System, Microcement, and Liquid Waterproofing Membrane form the core specification. Matte Black Shower System — A shower valve, rain head, and hand shower set with a matte black finish. It is compatible with both the Warm Brutalism palette and the converted bath layout. Moisture 9/10, slip 3/10. Microcement — A thin cement-based coating that creates a continuous, matte surface over walls and floors. It belongs to the Warm Brutalism material family and keeps the palette coherent. Moisture 9/10, slip 8/10. Liquid Waterproofing Membrane — A trowel- or roller-applied waterproof coating used under tile in showers and wet rooms. It is specified for the converted bath layout, where its dimensions and moisture performance matter. Moisture 10/10, slip 4/10. Use the material pages for installation notes and current cost bands.
How long does this combination take to build?
Plan for 18 to 31 working days after permits. The sequence is demolition, rough-in, waterproofing and flood test, tile, fixtures, glass, and punch list. Custom millwork or a stone tub can add lead time before installation begins.
What lighting temperature suits this bathroom?
Use 2700 K at 90+ CRI as the base. 2700 K at 90 CRI with wall washers or sconces. Avoid recessed downlights directly above the mirror, which flatten the stone. Put the vanity light at eye level and keep a separate dimmed circuit for the shower and night path.
Is this combination a good resale decision?
It is strongest when the layout fixes a daily problem and the palette stays broadly appealing. Stone and concrete create a strong, durable focal point. Avoid over-improving for the neighborhood and keep the waterproofing, ventilation, and plumbing documentation; those are the details a buyer's inspector can verify.