A measured index of the American bathroom

Bathroom Index
Menu

Combination 102 / 180

Moroccan bathroom in a Tub-to-Shower Conversion.

A measured plan for a moroccan converted bath at 5 by 8 feet, with the layout limits, material set, and cost lines in one place.

40 sq ft5′ × 8′18–30 days$13,000–$31,600

Palette

Moroccan

1.30 index

Moisture

8.3/10

Slip

6.8/10

Upkeep

Moderate

The measured brief

At 5 by 8 feet, this converted bath has enough room for a clear plan but no spare inches. The existing drain may need to move to the center of the new pan. The Moroccan treatment works because it removes visual stops rather than adding furniture.

A zellige feature wall with handmade irregular edges. Brass fixtures with a lacquered or living finish. The restraint is deliberate: the room should read as one composition from the door.

The layout's plumbing reality is straightforward: reuse the tub drain if the new pan aligns with it; otherwise relocate the drain before the pan is poured. a linear drain at the back wall simplifies the slope and tile layout.

The material set is short by design: Zellige Tile, Matte Black Shower System, and Linear Shower Drain. Irregular glaze with a living surface. A graphic silhouette in the wet zone. Together they cover the surface, fitting, and system layers without introducing a fourth visual language.

At $13,000–$31,600, the estimate lands between $325 and $790 per square foot. The largest allowances are finishes and fixtures; the 12 to 18 percent contingency is not padding in a room with this much hidden plumbing.

What changes when the room changes

The same moroccan palette would price differently in a larger room, but the bigger shift is geometric. The shower opening should be at least 24 inches wide. That is why the layout is part of the style decision rather than a separate drawing exercise.

“Same footprint, better daily use.”

Zellige Tile — Handmade Moroccan clay tile with a glossy, uneven glaze and visible color variation. It belongs to the Moroccan material family and keeps the palette coherent. Moisture 8/10, slip 6/10.

The plan

Tub-to-Shower Conversion, drawn to scale.

The drawing shows fixture positions, door swing, windows, dimension lines, and the selected style as a color reference. It is a planning drawing, not a permit set.

Measured floor plan for the Tub-to-Shower Conversion: 5 by 8 feet, 40 square feet. 60 in curbless shower60 in curbless shower24 in vanity24 in vanityToilet30 in doorLinear drainFixed glass5′–0″8′–0″N
Tub-to-Shower Conversion / 5′ × 8′ / 40 sq ftDrawing not to scale

Plumbing

Reuse the tub drain if the new pan aligns with it; otherwise relocate the drain before the pan is poured. A linear drain at the back wall simplifies the slope and tile layout.

Storage

Add a niche in the shower and a shallow cabinet where the tub deck used to be. A bench can provide storage and a place to sit.

Lighting

A 3000 K shower light and a separate vanity light are ideal. Make the shower light moisture-rated and place it outside the direct spray.

The material set

Three materials, three jobs.

One finish, one fixture family, and one technical layer. The compatibility score is a planning signal, not a warranty.

Skip to cost
Zellige Tile material section and layer build-up01020304MATERIAL / TILENOT TO SCALE

Handmade glazed tile

M01

Zellige Tile

Irregular glaze with a living surface.

Handmade Moroccan clay tile with a glossy, uneven glaze and visible color variation.

Installed
$22–$45
per sq ft
Moisture
8/10
Slip
6/10
Matte Black Shower System material section and layer build-up01020304MATERIAL / BRUSHEDNOT TO SCALE

Fixture

M02

Matte Black Shower System

A graphic silhouette in the wet zone.

A shower valve, rain head, and hand shower set with a matte black finish.

Installed
$350–$1,200
per set
Moisture
9/10
Slip
3/10
Linear Shower Drain material section and layer build-up01020304MATERIAL / LINEARNOT TO SCALE

Drainage

M03

Linear Shower Drain

One slope, one clean line.

A long, narrow drain set along a wall or at the shower threshold, used with a sloped shower floor.

Installed
$180–$700
per unit
Moisture
10/10
Slip
7/10
Selected materials for the Moroccan bathroom in a Tub-to-Shower Conversion, with compatibility, cost, and performance ratings.
MaterialTypeCompatibilityCostMoistureSlipUpkeep
Zellige TileHandmade glazed tile9.0/10$22–$45 / sq ft8/106/10High
Matte Black Shower SystemFixture8.0/10$350–$1,200 / set9/103/10Moderate
Linear Shower DrainDrainage8.0/10$180–$700 / unit10/107/10Moderate

Material note / 01

Zellige Tile — Handmade Moroccan clay tile with a glossy, uneven glaze and visible color variation. It belongs to the Moroccan material family and keeps the palette coherent. Moisture 8/10, slip 6/10.

Material note / 02

Matte Black Shower System — A shower valve, rain head, and hand shower set with a matte black finish. It is specified for the converted bath layout, where its dimensions and moisture performance matter. Moisture 9/10, slip 3/10.

Material note / 03

Linear Shower Drain — A long, narrow drain set along a wall or at the shower threshold, used with a sloped shower floor. It is specified for the converted bath layout, where its dimensions and moisture performance matter. Moisture 10/10, slip 7/10.

The cost

A $13,000–$31,600 plan.

Line-item estimate for a 40 sq ft converted bath in the Moroccan style. The range assumes the existing plumbing stack stays in place.

Estimated cost lines for the Moroccan bathroom in a Tub-to-Shower Conversion.
Cost lineLowHighShare of high
Demolition and disposalRemoval of existing finishes, fixtures, and debris haul-away.$500$8503%
Waterproofing and shower panMembrane, corners, drain bonding, and a 24-hour flood test.$450$8003%
Plumbing rough-in3 fixture connections; assumes the stack stays in place.$1,300$2,4008%
Electrical and ventilationGFCI protection, fan, lighting rough-in, and switches.$1,200$2,7009%
Wall and floor finishesTile, stone, or microcement, including setting materials and trim.$1,100$2,4008%
Fixtures and fittingsToilet, shower valve, tub filler, sink faucets, and drain trim.$2,700$6,05019%
Vanity and millwork1 basin; includes cabinet, top, and installation.$1,650$4,10013%
Design, permits, and inspectionsDrawing, permit fees, and inspection coordination.$600$1,5505%
Labor and project managementCoordination, site protection, and trade supervision.$2,100$5,85019%
ContingencyReserved for hidden conditions and owner changes.$1,400$4,85015%
Total project$13,000$31,600$325–$790 / sq ft

Estimated $13,000–$31,600 total / $325–$790 per sq ft / 18–30 working days.

Budget reading

$13,000–$31,600

$325–$790 per sq ft

  • Finishes and fixtures are the adjustable lines.
  • Waterproofing, plumbing, and labor are not the place to cut.
  • Contingency is included; keep it for hidden conditions.
  • Moving the stack or adding steam will push the high number higher.

Build window

18–30 days

After permits. Custom glass, stone, and millwork add lead time before installation.

Design moves

Four decisions that make the plan work.

Move / 01

01

Anchor the room with one signature material

A zellige feature wall with handmade irregular edges. Repeat that material at the shower niche or vanity rather than introducing a second accent.

Move / 02

02

Plan storage at the edges

Add a niche in the shower and a shallow cabinet where the tub deck used to be. A bench can provide storage and a place to sit. A recessed cabinet or a shallow niche adds more useful storage than a deeper vanity.

Move / 03

03

Design for the messiest day

The shower opening should be at least 24 inches wide. A bathroom that works after a shower, with wet towels and a full counter, is a better investment than one that only photographs well.

Move / 04

04

Resolve the wet detail before the finish

Tadelakt must be sealed with soap or a stone sealer and kept out of direct spray unless specified for wet use. Zellige needs a waterproof substrate and a flexible grout. The waterproofing and slope are the real luxury; the surface is the visible layer.

The watchouts

What to resolve before tile.

The five items below are the highest-risk details in this combination. The existing drain may need to move to the center of the new pan.

  1. The existing drain may need to move to the center of the new pan.

    01
  2. The shower opening should be at least 24 inches wide.

    02
  3. Zellige installation is slow and requires an experienced setter.

    03
  4. Plaster and brass need periodic maintenance.

    04
  5. Rectified porcelain printed with a fake zellige pattern.

    05

What carries the plan

  • Handmade tile gives a room unmatched depth and color variation.
  • Improves access and safety without moving walls.
  • A handmade surface with depth that printed tile cannot match.
  • Strong visual contrast with minimal effort.
  • Allows a single slope and large-format floor tile.

What can undermine it

  • Zellige installation is slow and requires an experienced setter.
  • Loses the only tub in a small home.
  • Irregular thickness makes installation slow.
  • Shows soap scum and hard-water spots.
  • Requires accurate framing and slope.

Keep comparing

Four nearby combinations.

The closest alternatives by style, layout, and budget. Open one change at a time so the cost difference has a cause.

Open the full matrix

Moroccan / Guest bath

001

5×8 Small Guest Bath

Plan a moroccan bathroom in a 5×8 small guest bath: layout limits, three compatible materials, a $12,700–$31,000 cost breakdown, and a practical FAQ.

Size
5′ × 8′
Budget
$12,700–$31,000
Build
16–28 d
Zellige TileCeiling Exhaust FanFloating Vanity
Open the plan

Moroccan / Galley bath

002

Narrow Galley Bathroom

Plan a moroccan bathroom in a narrow galley bathroom: layout limits, three compatible materials, a $13,800–$33,300 cost breakdown, and a practical FAQ.

Size
5′ × 10′
Budget
$13,800–$33,300
Build
20–33 d
TerrazzoCeiling Exhaust FanMatte Black Shower System
Open the plan

Moroccan / Attic bath

003

Attic Sloped-Ceiling Bath

Plan a moroccan bathroom in an attic sloped-ceiling bath: layout limits, three compatible materials, an $18,000–$43,100 cost breakdown, and a practical FAQ.

Size
8′ × 10′
Budget
$18,000–$43,100
Build
29–44 d
Zellige TileCeiling Exhaust FanFluted Oak Vanity
Open the plan

Moroccan / Half bath

004

Under-Stairs Half Bath

Plan a moroccan bathroom in an under-stairs half bath: layout limits, three compatible materials, a $9,300–$22,900 cost breakdown, and a practical FAQ.

Size
4′ × 6′
Budget
$9,300–$22,900
Build
14–26 d
Brushed Brass FixturesCeiling Exhaust FanWall-Hung Toilet
Open the plan

Field guides

The systems behind this plan.

All 15 guides

FAQ

Moroccan in a Tub-to-Shower Conversion: the questions.

Practical answers drawn from the specification, cost model, and installation sequence.

How much does a Moroccan bathroom in a Tub-to-Shower Conversion cost?
A full remodel at this specification is estimated at $13,000–$31,600, or $325 to $790 per square foot. The largest lines are wall and floor finishes ($1,100–$2,400) and fixtures ($2,700–$6,050). The range assumes the stack stays in place and the recommended materials are used. Moving the toilet or tub, adding a steam generator, or choosing solid slab stone can push the upper number higher.
Will Moroccan work in a 5′ × 8′ converted bath?
Yes, if the plan respects the room's actual limits. The existing drain may need to move to the center of the new pan. A single feature wall works in compact baths. In larger rooms, use a zellige shower and a quiet plaster field to avoid visual overload. Keep the first priority on the clear path and the wet-zone detailing, then let the palette do the rest.
Which three materials should I specify?
Zellige Tile, Matte Black Shower System, and Linear Shower Drain form the core specification. Zellige Tile — Handmade Moroccan clay tile with a glossy, uneven glaze and visible color variation. It belongs to the Moroccan material family and keeps the palette coherent. Moisture 8/10, slip 6/10. Matte Black Shower System — A shower valve, rain head, and hand shower set with a matte black finish. It is specified for the converted bath layout, where its dimensions and moisture performance matter. Moisture 9/10, slip 3/10. Linear Shower Drain — A long, narrow drain set along a wall or at the shower threshold, used with a sloped shower floor. It is specified for the converted bath layout, where its dimensions and moisture performance matter. Moisture 10/10, slip 7/10. Use the material pages for installation notes and current cost bands.
How long does this combination take to build?
Plan for 18 to 30 working days after permits. The sequence is demolition, rough-in, waterproofing and flood test, tile, fixtures, glass, and punch list. Custom millwork or a stone tub can add lead time before installation begins.
What lighting temperature suits this bathroom?
Use 2700 K at 90+ CRI as the base. 2700 K at 90 CRI flatters terracotta and brass. Use a warm niche light and avoid cool downlights that make zellige look flat. Put the vanity light at eye level and keep a separate dimmed circuit for the shower and night path.
Is this combination a good resale decision?
It is strongest when the layout fixes a daily problem and the palette stays broadly appealing. Handmade tile gives a room unmatched depth and color variation. Avoid over-improving for the neighborhood and keep the waterproofing, ventilation, and plumbing documentation; those are the details a buyer's inspector can verify.