Fixture
M01Matte Black Shower System
A graphic silhouette in the wet zone.
A shower valve, rain head, and hand shower set with a matte black finish.
- Installed
- $350–$1,200
- per set
- Moisture
- 9/10
- Slip
- 3/10
A measured index of the American bathroom
Vol. 01 / November 2026 / Costs in USD
Combination 030 / 180
A measured plan for an industrial concrete converted bath at 5 by 8 feet, with the layout limits, material set, and cost lines in one place.
Palette
Industrial Concrete
Moisture
8.1/10
Slip
6.3/10
Upkeep
Low
The measured brief
This 40 sq ft converted bath is defined by its proportions: 5 feet across and 8 feet deep. The existing drain may need to move to the center of the new pan. The Industrial Concrete answer is to keep the wet zone legible and spend the remaining wall space on storage and light.
A troweled microcement wall with visible movement and a matte sealer. Black steel shower framing or a black grid glass partition. Those two moves do more for the room than a decorative feature wall.
Plan the wet zone first. Reuse the tub drain if the new pan aligns with it; otherwise relocate the drain before the pan is poured. A linear drain at the back wall simplifies the slope and tile layout. Add a niche in the shower and a shallow cabinet where the tub deck used to be. A bench can provide storage and a place to sit.
The material set is short by design: Matte Black Shower System, Terrazzo, and Liquid Waterproofing Membrane. A graphic silhouette in the wet zone. Aggregate, binder, and a thousand small decisions. Together they cover the surface, fitting, and system layers without introducing a fourth visual language.
At $12,000–$29,100, the estimate lands between $300 and $728 per square foot. The largest allowances are finishes and fixtures; the 12 to 18 percent contingency is not padding in a room with this much hidden plumbing.
The same industrial concrete palette would price differently in a larger room, but the bigger shift is geometric. The shower opening should be at least 24 inches wide. That is why the layout is part of the style decision rather than a separate drawing exercise.
“Same footprint, better daily use.”
Matte Black Shower System — A shower valve, rain head, and hand shower set with a matte black finish. It is compatible with both the Industrial Concrete palette and the converted bath layout. Moisture 9/10, slip 3/10.
The plan
The drawing shows fixture positions, door swing, windows, dimension lines, and the selected style as a color reference. It is a planning drawing, not a permit set.
Plumbing
Reuse the tub drain if the new pan aligns with it; otherwise relocate the drain before the pan is poured. A linear drain at the back wall simplifies the slope and tile layout.
Storage
Add a niche in the shower and a shallow cabinet where the tub deck used to be. A bench can provide storage and a place to sit.
Lighting
A 3000 K shower light and a separate vanity light are ideal. Make the shower light moisture-rated and place it outside the direct spray.
The material set
One finish, one fixture family, and one technical layer. The compatibility score is a planning signal, not a warranty.
Fixture
M01A graphic silhouette in the wet zone.
A shower valve, rain head, and hand shower set with a matte black finish.
Composite surface
M02Aggregate, binder, and a thousand small decisions.
A composite surface of stone chips set in cement or resin, used for floors, walls, and vanity tops.
Membrane
M03A continuous skin for complex corners.
A trowel- or roller-applied waterproof coating used under tile in showers and wet rooms.
| Material | Type | Compatibility | Cost | Moisture | Slip | Upkeep |
|---|---|---|---|---|---|---|
| Matte Black Shower System | Fixture | 10.0/10 | $350–$1,200 / set | 9/10 | 3/10 | Moderate |
| Terrazzo | Composite surface | 9.0/10 | $18–$35 / sq ft | 9/10 | 8/10 | Low |
| Liquid Waterproofing Membrane | Membrane | 8.0/10 | $3–$7 / sq ft | 10/10 | 4/10 | Low |
Material note / 01
Matte Black Shower System — A shower valve, rain head, and hand shower set with a matte black finish. It is compatible with both the Industrial Concrete palette and the converted bath layout. Moisture 9/10, slip 3/10.
Material note / 02
Terrazzo — A composite surface of stone chips set in cement or resin, used for floors, walls, and vanity tops. It belongs to the Industrial Concrete material family and keeps the palette coherent. Moisture 9/10, slip 8/10.
Material note / 03
Liquid Waterproofing Membrane — A trowel- or roller-applied waterproof coating used under tile in showers and wet rooms. It is specified for the converted bath layout, where its dimensions and moisture performance matter. Moisture 10/10, slip 4/10.
The cost
Line-item estimate for a 40 sq ft converted bath in the Industrial Concrete style. The range assumes the existing plumbing stack stays in place.
| Cost line | Low | High | Share of high |
|---|---|---|---|
| Demolition and disposalRemoval of existing finishes, fixtures, and debris haul-away. | $500 | $850 | 3% |
| Waterproofing and shower panMembrane, corners, drain bonding, and a 24-hour flood test. | $450 | $800 | 3% |
| Plumbing rough-in3 fixture connections; assumes the stack stays in place. | $1,300 | $2,400 | 8% |
| Electrical and ventilationGFCI protection, fan, lighting rough-in, and switches. | $1,200 | $2,700 | 9% |
| Wall and floor finishesTile, stone, or microcement, including setting materials and trim. | $950 | $2,050 | 7% |
| Fixtures and fittingsToilet, shower valve, tub filler, sink faucets, and drain trim. | $2,450 | $5,200 | 18% |
| Vanity and millwork1 basin; includes cabinet, top, and installation. | $1,300 | $3,700 | 13% |
| Design, permits, and inspectionsDrawing, permit fees, and inspection coordination. | $600 | $1,550 | 5% |
| Labor and project managementCoordination, site protection, and trade supervision. | $1,950 | $5,400 | 19% |
| ContingencyReserved for hidden conditions and owner changes. | $1,300 | $4,450 | 15% |
| Total project | $12,000 | $29,100 | $300–$728 / sq ft |
Estimated $12,000–$29,100 total / $300–$728 per sq ft / 18–30 working days.
Budget reading
$12,000–$29,100
$300–$728 per sq ft
Build window
18–30 days
After permits. Custom glass, stone, and millwork add lead time before installation.
Design moves
Move / 01
01Matte Black Shower System is the strongest visual investment in this scheme. Keep the other surfaces quieter so the budget reads as intention rather than compromise.
Move / 02
02A troweled microcement wall with visible movement and a matte sealer. Repeat that material at the shower niche or vanity rather than introducing a second accent.
Move / 03
03Add a niche in the shower and a shallow cabinet where the tub deck used to be. A bench can provide storage and a place to sit. A recessed cabinet or a shallow niche adds more useful storage than a deeper vanity.
Move / 04
04The shower opening should be at least 24 inches wide. A bathroom that works after a shower, with wet towels and a full counter, is a better investment than one that only photographs well.
The watchouts
The five items below are the highest-risk details in this combination. The existing drain may need to move to the center of the new pan.
The existing drain may need to move to the center of the new pan.
01The shower opening should be at least 24 inches wide.
02Sealed concrete and microcement need periodic re-sealing.
03Dark surfaces show soap residue and hard-water film.
04Faux brick veneer in the shower zone.
05Keep comparing
The closest alternatives by style, layout, and budget. Open one change at a time so the cost difference has a cause.
Industrial Concrete / Guest bath
001Plan an industrial concrete bathroom in a 5×8 small guest bath: layout limits, three compatible materials, an $11,600–$28,500 cost breakdown, and a practical FAQ.
Industrial Concrete / Accessible bath
002Plan an industrial concrete bathroom in an accessible walk-in bath: layout limits, three compatible materials, a $16,700–$39,900 cost breakdown, and a practical FAQ.
Industrial Concrete / Galley bath
003Plan an industrial concrete bathroom in a narrow galley bathroom: layout limits, three compatible materials, a $12,600–$30,600 cost breakdown, and a practical FAQ.
Industrial Concrete / Half bath
004Plan an industrial concrete bathroom in an under-stairs half bath: layout limits, three compatible materials, an $8,600–$21,200 cost breakdown, and a practical FAQ.
Field guides
Waterproofing / 7 min
G01A step-by-step flood test procedure for shower pans, including failure points and documentation.
Budget / 8 min
G02How to build a bathroom budget that survives hidden conditions, allowances, and change orders.
Lighting / 8 min
G03How to choose kelvin, CRI, and fixture placement for grooming, relaxing, and safe wet-zone use.
FAQ
Practical answers drawn from the specification, cost model, and installation sequence.