A measured plan for a coastal wet room at 7 by 9 feet, with the layout limits, material set, and cost lines in one place.

63 sq ft7′ × 9′31–44 days$16,400–$39,100

Palette

Coastal

1.12 index

Moisture

8.7/10

Slip

6.7/10

Upkeep

Low

The measured brief

The Curbless Wet Room is a 7-by-9-foot wet room with 63 square feet of floor. The entire floor must be waterproofed and sloped to drain. A Coastal scheme turns that limitation into the organizing line of the room.

Beadboard or a simple paneled vanity painted in a soft white. Choose powder-coated or marine-grade hardware, sealed wood, and porcelain rather than natural stone where possible

Use a wall-hung vanity, a deep niche, and a freestanding shelf. Keep towels on a hook outside the spray zone. That storage decision comes before tile, because a later cabinet cannot recover floor area.

The material set is short by design: Wood-Look Porcelain Plank, Frameless Glass Enclosure, and Ceiling Exhaust Fan. The warmth of wood, the tolerance of porcelain. Less frame, more light. Together they cover the surface, fitting, and system layers without introducing a fourth visual language.

At $16,400–$39,100, the estimate lands between $260 and $621 per square foot. The largest allowances are finishes and fixtures; the 12 to 18 percent contingency is not padding in a room with this much hidden plumbing.

What changes when the room changes

The same coastal palette would price differently in a larger room, but the bigger shift is geometric. The vanity and toilet should stay out of the direct spray. That is why the layout is part of the style decision rather than a separate drawing exercise.

“A 63 sq ft open shower and bathing room.”

Wood-Look Porcelain Plank — A porcelain plank printed and textured to resemble timber, used on floors and walls. It belongs to the Coastal material family and keeps the palette coherent. Moisture 9/10, slip 7/10.

The plan

Curbless Wet Room, drawn to scale.

The drawing shows fixture positions, door swing, windows, dimension lines, and the selected style as a color reference. It is a planning drawing, not a permit set.

Measured floor plan for the Curbless Wet Room: 7 by 9 feet, 63 square feet. Curbless showerCurbless showerTubTubWall-hung vanityWall-hung vanityToilet32 in doorLinear drainHeated floor7′–0″9′–0″N
Curbless Wet Room / 7′ × 9′ / 63 sq ftDrawing not to scale

Plumbing

Center the tub on its own supply and keep the shower valve reachable from the entry. A linear drain at the shower wall reduces framing depth and simplifies the pan.

Storage

Use a wall-hung vanity, a deep niche, and a freestanding shelf. Keep towels on a hook outside the spray zone.

Lighting

Use 3000 K at 90 CRI with a dimmable shower light and a separate vanity light. A moisture-rated fixture is required in the wet zone.

The material set

Three materials, three jobs.

One finish, one fixture family, and one technical layer. The compatibility score is a planning signal, not a warranty.

Skip to cost
Wood-Look Porcelain Plank material section and layer build-up01020304MATERIAL / WOODNOT TO SCALE

Surface

M01

Wood-Look Porcelain Plank

The warmth of wood, the tolerance of porcelain.

A porcelain plank printed and textured to resemble timber, used on floors and walls.

Installed
$8–$20
per sq ft
Moisture
9/10
Slip
7/10
Frameless Glass Enclosure material section and layer build-up01020304MATERIAL / GLASSNOT TO SCALE

Enclosure

M02

Frameless Glass Enclosure

Less frame, more light.

A shower enclosure made from tempered glass with minimal or concealed hardware.

Installed
$80–$160
per sq ft
Moisture
9/10
Slip
3/10
Ceiling Exhaust Fan material section and layer build-up01020304MATERIAL / VENTNOT TO SCALE

Ventilation

M03

Ceiling Exhaust Fan

The least visible fixture that matters most.

A ceiling-mounted fan that removes moisture, odors, and volatile organic compounds from the bathroom.

Installed
$150–$550
per unit
Moisture
9/10
Slip
2/10
Selected materials for the Coastal bathroom in a Curbless Wet Room, with compatibility, cost, and performance ratings.
MaterialTypeCompatibilityCostMoistureSlipUpkeep
Wood-Look Porcelain PlankSurface9.0/10$8–$20 / sq ft9/107/10Low
Frameless Glass EnclosureEnclosure8.5/10$80–$160 / sq ft9/103/10Low
Ceiling Exhaust FanVentilation8.5/10$150–$550 / unit9/102/10Low

Material note / 01

Wood-Look Porcelain Plank — A porcelain plank printed and textured to resemble timber, used on floors and walls. It belongs to the Coastal material family and keeps the palette coherent. Moisture 9/10, slip 7/10.

Material note / 02

Frameless Glass Enclosure — A shower enclosure made from tempered glass with minimal or concealed hardware. It is specified for the wet room layout, where its dimensions and moisture performance matter. Moisture 9/10, slip 3/10.

Material note / 03

Ceiling Exhaust Fan — A ceiling-mounted fan that removes moisture, odors, and volatile organic compounds from the bathroom. It belongs to the Coastal material family and keeps the palette coherent. Moisture 9/10, slip 2/10.

The cost

A $16,400–$39,100 plan.

Line-item estimate for a 63 sq ft wet room in the Coastal style. The range assumes the existing plumbing stack stays in place.

Estimated cost lines for the Coastal bathroom in a Curbless Wet Room.
Cost lineLowHighShare of high
Demolition and disposalRemoval of existing finishes, fixtures, and debris haul-away.$800$1,3503%
Waterproofing and shower panMembrane, corners, drain bonding, and a 24-hour flood test.$800$1,5504%
Plumbing rough-in4 fixture connections; assumes the stack stays in place.$2,000$3,75010%
Electrical and ventilationGFCI protection, fan, lighting rough-in, and switches.$1,400$3,0008%
Wall and floor finishesTile, stone, or microcement, including setting materials and trim.$1,450$3,1508%
Fixtures and fittingsToilet, shower valve, tub filler, sink faucets, and drain trim.$3,400$7,60019%
Vanity and millwork1 basin; includes cabinet, top, and installation.$1,400$3,7009%
Design, permits, and inspectionsDrawing, permit fees, and inspection coordination.$700$1,7504%
Labor and project managementCoordination, site protection, and trade supervision.$2,650$7,25019%
ContingencyReserved for hidden conditions and owner changes.$1,800$6,00015%
Total project$16,400$39,100$260–$621 / sq ft

Estimated $16,400–$39,100 total / $260–$621 per sq ft / 31–44 working days.

Budget reading

$16,400–$39,100

$260–$621 per sq ft

  • Finishes and fixtures are the adjustable lines.
  • Waterproofing, plumbing, and labor are not the place to cut.
  • Contingency is included; keep it for hidden conditions.
  • Moving the stack or adding steam will push the high number higher.

Build window

31–44 days

After permits. Custom glass, stone, and millwork add lead time before installation.

Design moves

Four decisions that make the plan work.

Move / 01

01

Anchor the room with one signature material

Beadboard or a simple paneled vanity painted in a soft white. Repeat that material at the shower niche or vanity rather than introducing a second accent.

Move / 02

02

Plan storage at the edges

Use a wall-hung vanity, a deep niche, and a freestanding shelf. Keep towels on a hook outside the spray zone. A recessed cabinet or a shallow niche adds more useful storage than a deeper vanity.

Move / 03

03

Design for the messiest day

The vanity and toilet should stay out of the direct spray. A bathroom that works after a shower, with wet towels and a full counter, is a better investment than one that only photographs well.

Move / 04

04

Resolve the wet detail before the finish

Use sealed engineered wood or marine-grade plywood for the vanity. Avoid unsealed natural stone and untreated wood in the shower. The waterproofing and slope are the real luxury; the surface is the visible layer.

The watchouts

What to resolve before tile.

The five items below are the highest-risk details in this combination. The entire floor must be waterproofed and sloped to drain.

  1. The entire floor must be waterproofed and sloped to drain.

    01
  2. The vanity and toilet should stay out of the direct spray.

    02
  3. Cheap coastal decor quickly becomes thematic.

    03
  4. White surfaces show sand and water spots.

    04
  5. Anchor motifs, rope trim, and nautical signs.

    05

What carries the plan

  • A light palette makes small bathrooms feel larger.
  • Open plan makes a 63 sq ft room feel larger.
  • Warm wood look with no swelling or rot.
  • Keeps the bathroom visually open.
  • Removes moisture that causes mold and peeling paint.

What can undermine it

  • Cheap coastal decor quickly becomes thematic.
  • Full-floor waterproofing is expensive and unforgiving.
  • Can look repetitive if the graphics are poor.
  • Shows water spots and soap film.
  • A noisy fan is often left off.

Keep comparing

Four nearby combinations.

The closest alternatives by style, layout, and budget. Open one change at a time so the cost difference has a cause.

Open the full matrix

Coastal / Attic bath

001

Attic Sloped-Ceiling Bath

Plan a coastal bathroom in an attic sloped-ceiling bath: layout limits, three compatible materials, a $16,100–$38,300 cost breakdown, and a practical FAQ.

Size
8′ × 10′
Budget
$16,100–$38,300
Build
29–42 d
Wood-Look Porcelain PlankCeiling Exhaust FanFrameless Glass Enclosure
Open the plan

Coastal / Family bath

002

Split Wet-Dry Bath

Plan a coastal bathroom in a split wet-dry bath: layout limits, three compatible materials, a $15,300–$36,600 cost breakdown, and a practical FAQ.

Size
6′ × 10′
Budget
$15,300–$36,600
Build
25–37 d
Wood-Look Porcelain PlankFrameless Glass EnclosureCeiling Exhaust Fan
Open the plan

Coastal / Accessible bath

003

Accessible Walk-In Bath

Plan a coastal bathroom in an accessible walk-in bath: layout limits, three compatible materials, a $16,300–$38,800 cost breakdown, and a practical FAQ.

Size
8′ × 10′
Budget
$16,300–$38,800
Build
32–47 d
Wood-Look Porcelain PlankCeiling Exhaust FanTeak Shower Bench
Open the plan

Coastal / Galley bath

004

Narrow Galley Bathroom

Plan a coastal bathroom in a narrow galley bathroom: layout limits, three compatible materials, a $12,300–$29,600 cost breakdown, and a practical FAQ.

Size
5′ × 10′
Budget
$12,300–$29,600
Build
20–30 d
Ceiling Exhaust FanWood-Look Porcelain PlankFrameless Glass Enclosure
Open the plan

Field guides

The systems behind this plan.

All 15 guides

FAQ

Coastal in a Curbless Wet Room: the questions.

Practical answers drawn from the specification, cost model, and installation sequence.

How much does a Coastal bathroom in a Curbless Wet Room cost?
A full remodel at this specification is estimated at $16,400–$39,100, or $260 to $621 per square foot. The largest lines are wall and floor finishes ($1,450–$3,150) and fixtures ($3,400–$7,600). The range assumes the stack stays in place and the recommended materials are used. Moving the toilet or tub, adding a steam generator, or choosing solid slab stone can push the upper number higher.
Will Coastal work in a 7′ × 9′ wet room?
Yes, if the plan respects the room's actual limits. The entire floor must be waterproofed and sloped to drain. Works in compact guest baths and large family baths alike. In a narrow room, use a shower curtain instead of a swinging glass door to save clearance. Keep the first priority on the clear path and the wet-zone detailing, then let the palette do the rest.
Which three materials should I specify?
Wood-Look Porcelain Plank, Frameless Glass Enclosure, and Ceiling Exhaust Fan form the core specification. Wood-Look Porcelain Plank — A porcelain plank printed and textured to resemble timber, used on floors and walls. It belongs to the Coastal material family and keeps the palette coherent. Moisture 9/10, slip 7/10. Frameless Glass Enclosure — A shower enclosure made from tempered glass with minimal or concealed hardware. It is specified for the wet room layout, where its dimensions and moisture performance matter. Moisture 9/10, slip 3/10. Ceiling Exhaust Fan — A ceiling-mounted fan that removes moisture, odors, and volatile organic compounds from the bathroom. It belongs to the Coastal material family and keeps the palette coherent. Moisture 9/10, slip 2/10. Use the material pages for installation notes and current cost bands.
How long does this combination take to build?
Plan for 31 to 44 working days after permits. The sequence is demolition, rough-in, waterproofing and flood test, tile, fixtures, glass, and punch list. Custom millwork or a stone tub can add lead time before installation begins.
What lighting temperature suits this bathroom?
Use 3000 K at 90+ CRI as the base. 3000 K at 90 CRI keeps white beadboard clean rather than yellow. Add a dimmer for evening use. Put the vanity light at eye level and keep a separate dimmed circuit for the shower and night path.
Is this combination a good resale decision?
It is strongest when the layout fixes a daily problem and the palette stays broadly appealing. A light palette makes small bathrooms feel larger. Avoid over-improving for the neighborhood and keep the waterproofing, ventilation, and plumbing documentation; those are the details a buyer's inspector can verify.